One Colmore Row

  • Client: Apam
  • Location: Birmingham
  • Date: Jan 2020

This building was suffering from failing existing central plant and we assisted with the design of a replacement programe such that the building can be altered to VRF and Local Ventilation. The project consisted of one floor and reception along with plumbing works and provision of shower block to the basment.

The design was based around cladding exposed services to create a modern finish so as to maximise floor to ceiling heights.