Pynes Hill

  • Client: Jacobs
  • Location: Exeter
  • Date: Sep 2018

Brief: To provide a Category B fit out of a recently refurbished floor to Jacob’s specification and customised layout whilst maintaining high levels of comfort.

Action: We designed and adapted the Comfort Cooling and Heating systems and installed specially selected split systems to cellular offices and communications room.

"Cedar's team undertook the work with a positive attitude and became an integral part of the design and delivery team. Cedar’s initial design input gave the client savings on the contract sum and variation costs were controlled to provide an overall budget saving"